Wind turbines-clearly not needed

Noted in a recent article was the following admission by Robert Hornung, President of CanWEA (Canadian Wind Energy Association); “wind, which tends to generate most of its power at night,”!  His reflection was related to the very strong probability CanWEA will merge with CanSIA and the merger will reputedly produce harmony as solar generates power when the sun shines.

What Hornung failed to admit was wind habitually produces power during low demand times which are a regular occurrence in Ontario during Spring and Fall months.  The month of October is confirming its bad habit which costs Ontario ratepayers dearly.

A recent example of the foregoing occurred on October 23rd when wind was blowing during the night and during the day.  IESO’s “Generators Output and Capability Report” discloses wind was blowing!  Approximately 47,000 MWh of wind was accepted into the grid and about 50,650 MWh were curtailed.  So, wind could have delivered 97,650 MWh when Ontario demand averaged 13,910 MW and peaked at 16,235 MW for the day.  Contracted nuclear at 10,700 MW of capacity could have easily teamed up with some of the 8,000 MW of contracted hydro and supplied all our needs.  During high demand periods in the summer and winter months gas plants can easily supply additional needs when demand exceeds nuclear and hydro’s capacity.

The IESO report also suggests we were steaming off nuclear (and paying for it) and probably spilling hydro (which we also pay for) but IESO don’t disclose either of the latter two events.  To top things off we were paying gas plants to idle (around $2.5 million per day). Many of them were originally contracted to back up wind and solar for when the wind isn’t blowing or the sun doesn’t shine.

The effect on ratepayers, in simple terms, is, we picked up the costs of wind’s generation as well as the costs of curtailment.  We paid $120/MWh (megawatt hour) for curtailed wind and $135/MWh for grid accepted wind.  The total cost for wind (without factoring in costs related to spilled hydro, steamed off nuclear or idling gas plants) on the 23rd therefore was $12,423,000 or $264/MWh (26.4cents/kWh).

When IESO finally published their Daily Market Summary for that day it disclosed the average HOEP (hourly Ontario energy price) was in negative territory at -0.88($/MWh).  It also disclosed Ontario’s net exports (exports minus imports) averaged 1,943 MW per hour so totaled approximately 46,600 MW or 400 MW less than grid accepted wind.

At the CanWEA conference where Hornung uttered his omission he also stated the following:  “This opens up some interesting opportunities for wind for two reasons: 1) wind energy can provide more services to the grid than just low-cost energy, and can support grid reliability if encouraged to do so as regulatory and market frameworks modernize; ”.  The activities on the day this article highlights and most other spring and fall days clearly demonstrate, wind energy is neither, low-cost energy or has abilities to support grid reliability (forced curtailment does)!

What the above clearly shows is the $12.4 million we paid for the 47,000 MW of grid accepted wind was simply Ontario ratepayers/taxpayers being forced to give our money away to NY, Michigan, etc. without the ability to stop it!

The time has come for Hornung to admit all the failings of industrial wind turbines!

Author: parkergallantenergyperspectivesblog

Retired international banker.

6 thoughts on “Wind turbines-clearly not needed”

  1. Over half of the turbines in the largest project in Ontario have been derated.
    https://london.ctvnews.ca/turbines-near-goderich-to-be-slowed-down-to-reduce-sound-1.4487408
    The audible noise was reported for four at least four years and finally the MoE declared more than half of the turbines to be non-compliant for tonal noise.
    Has anyone calculated the reduced efficiency of this project now that 89 turbines have been slowed down?
    Are Ontario tax payers aware that they’re still subsidizing an even less effective source of energy?

    Like

  2. Please ask anyone who denies health harm of Industrial Wind Turbines to watch this presentation. University of Waterloo, Waterloo Ontario Canada.

    Title: “Infrasound and Low Frequency Noise: Physics & Cells, History & Health”
    Speaker: Dr Mariana Alves-Pereira
    Location: University of Waterloo
    Date: September 12, 2019

    Video archive of presentation:
    https://livestream.com/itmsstudio/events/8781285

    Dr. Alves-Pereira’s research profile is at https://www.researchgate.net/profile/Mariana_Alves-pereira

    Note; there is approx 2 mins of dead air at the beginning. The talk is ~50 minutes, followed by a long Q&A.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s